Respected Sir / Mam,


I have been cheated for Duplex at Heavens Life located at Katara Hills, Barrai Village developed by Fast Track Real Estate Developers.


For that already I have online complained to MP Police website. Also colony residents have complained to katara hills police station. Respected Sir, Below I am writing, how builder have cheated us. Kindly guide me for justice.


Sir My deal was done in September 2015, and Registry was done on 10th June 2016, and I was given incomplete house on 22.09.2016, during deal I told them already I want to celebrate my son birthday on 23/06/2018, but till this date my home work was not complete, when they gave us house on that time lots of jobs was pending at my house and society.(Still pending till today)


And for that several time I was reminding them to complete all the jobs at our duplex and society, but they did nothing. And then I sent them email in May -2018 to complete all the jobs, I wrote already in email, your payment is ready to us please complete all the related jobs. When they were not doing anything then I complained to Rera on 11-06-2018 and on first hearing they cut the power of all residents. Then all residents went to CM House police station. Video link I am sharing herewith.


Also Rera order have come on 05.03.2019, but after Rera order they have done nothing. Also all residents have given them several time reminder letter, and reply letter they already accepted to get it done all jobs as earliest. But still nothing is done.


Sir, at my home lots of jobs pending, still my duplex is not painted, no finishing jobs, no park to each house, single painting coat is not done in service area, No video door bell, House is leaking in rainy weather, some broken tiles they fixed, in all toiled windows jobs are not done, No texture paint on one wall, No fall ceiling in One room, No electricity meter, no 24/7 electricity backup etc. still lots of jobs to be done. Some extra jobs in kitchen(which they told us one lacs extra jobs).


And in Society, No swimming Pool and kids pool, No Club House, No Jogging track, No Temple, No Children play area with equipment,, No meditation hall, No security camplus, No spa, No Meditation Hall, Indoor Games, Library, Lounge, Kitty Party Hall etc lots of jobs are pending at Duplex .


At the time of my deal I gave them security cheque,(and we were buying house and believed to builder), and I wrote the builder’s company name on cheque and builder have filled date and amount by their self and presented security cheque to Central Madhya Pradesh Gramin Bank Shahpura Branch on 20/07/2018,.


Sir, builder have showed us lots of dream, and now all the dream are draining, builder is doing nothing and troubling to us.


Due to Double handwriting cheque should not have been accepted by gramin bank, but Central Madhya Pradesh Gramin Bank Shahpura Branch have accepted cheque and send to Union bank service branch Bhopal, also cheuqe should be rejected by service branch bhopal of Union bank, but they also accepted cheque, and issue the return memo, due to insufficient balance cheque bounce. And now builder have filed case 138 against me, where I got the bail on 15/09/2019.


Sir builder always powerful in money and power. And bankers were bend or afraid due to that. May builder make preplanned and give bribe to Central Madhya Pradesh Gramin Bank Shahpura Branch and Union Bank Service Branch Bhopal.


Sir, builder have written Rs. 7 lacs on the cheque, where I am to pay Rs. 680,000/- after completing all the jobs, I am agree to pay but after all jobs are to be done at our duplex and society as per their promises. Sir on the notice, is written I gave him Rs. 3720,000/-, where I have given to them Rs. 3820,000/-. And on the Rera order also I was typing everytime,


Sir, after buying expensive house I am paying to lawyer, court fee, mentally tension, all the time crying. Because builder have looted my whole life earned money, and playing from that. And we are crying, and we don’t have any option.


Sir, Fast Track Real Estate Developers is suspended on Rera Website. And now I checked they have changed their company name i.e fast track megaventures private limited.


Sir Please guide me for justice.


As under also I am sharing all videos link which was uploaded on youtube, so you can see all the frauds with all residents.


Respected Sir, its humble request to guide us for justice, I don''t want be part of court / police, I am afraid of this, because I am salaried employee, and builder have looted my whole life earning, and then filed me 138 case for me. Sir Please look into matter, study my case, if anything you required I can share with you.


Thanks & Regards


https://youtube.com/results?search_query=heavens+life+bhopal


https://youtube.com/watch?v=IyPEMJyjVD8&t=1443s


https://youtube.com/watch?v=ns5XzjHC0wA


https://youtube.com/watch?v=UyyEJcqaEsU&t=83s


https://youtube.com/watch?v=r4w5totqjAY


https://youtube.com/watch?v=KMVM1G4lhgc


Its Humble request please guide me for justice. Builder have looted my whole life earned money and given too much tension, on broucher you can see how builder show us lots of dream, and all are going to drainage, builder is powerful, and they are doing nothing even after Rera Order.