Avoid Rohan Upavan- Part 1
Jun 19, 2018 05:01 PM
32248 views
(Updated Jun 21, 2018 08:48 AM)
Product Implementation Rate:
Facts:
13.5 Acres, 1030 Apartments
Phase-1, 6 blocks possession-2021
Phase-2 7 blocks possession-2024
Prelaunch phase. Excavation has started.
Detailed RERA information is available.
https://rera.karnataka.gov.in/projectDetails?PROJECT_ID=91aZCevSg9F3QJaIELbo5A%
3D%3D
They seem to have registered only 3 blocks for Phase-1 as per RERA.
Pros:
The greenery that is already present in the site is the only selling point.
Cons:
Upavan is quite far from human settlement.
Blocks in Phase 1 are located in a low lying area. Poor designing of the project will cause the ground and basements to be flooded during rains plus there is only 1 entry 1 exit making it a trap.
Floor plans have not been designed for privacy.
Innovative method for adding overheads over Base price. Final pricing is exorbitant considering the location value.
Wasted enough time for today, will continue another time.
-
-