Unsafe for Human Life- Poor Work Carried out
Jul 10, 2019 11:20 PM
13618 views
Product Implementation Rate:
Dear All Radiance Customers
I purchased the flat in Radiance Mercury . And after taking the possession from builder I was planned to do some interior work in my flat.(Like wooden works, false ceiling works, and additional lighting works)
For doing the work I engaged the one of the interior vendor and allowed him to do the physical inspection. While doing the inspection this interior vendor identified that, the electrical work executed inside the apartment is not as per the Indian standard and the neutral and earth wires are looped between the
hall to living,
living to bed room 1
hall to bed room2
Kitchen to living etc.
If there is a any fault in any one location of the area like fan, fridge, washing machine light etc. due to this loop wires the entire flat may go the tripping issue, if the tripping is not happen there may be electrical short circuit and may lead to electrical fire.
This mistake is happened due to poor workman ship and no proper supervision.
By seeing the issue which is clearly showing that the work executed contractor cheated the developer or the work executed contractor and he supervised person jointly cheated the developer.
If there is a loop between any two location, we can accept the issue is due to some human error.
But all the location in the apartment is looped. By seeing this interior vendor informed that he will not do any lighting work in my flat.
My self also accepted not to do any electrical changes in my apartment. Instead of taking the power supply form the existing wiring we done the additional lighting with plug arrangement and used the available builder installed socket to use the additional lighting on.
While doing the interior works the safety tripping also not worked and the interior contract labour also gets electrical shock few time.
Now also whenever there is TNEB power failure, even though the DG gets on the power back up will not work.
During every power failure, I need to call the maintenance person to switch on the lighting.
Why this kind of major issues made by the execution team. Why the developer is not engaging the efficient engineers to monitor this kind of life saving works.
As a buyers we are not able to spent time to construct the house and we are depending the developers to carry out the job.
But the developer is not employing the right persons to carry out the work and playing with our life.
Like me other buyers also may faced some other issue. If they share their experience the new buyers may discuss with the sales person and if the sales person face this kind of issue from the new buyers, definitely the builder will rectify the issue without additional cost .
And also if the management come to know this kind of issue the management will try to do some quality work by employing the effective engineers.
I need to notice the civil issues in the coming days. Then only I can able to share my experience with respect to civil works.
One of other customer shared his experience in the other 2 Radiance projects.( He also dropped his plan of buying the flat in Radiance).
While reading, that also seems to be poor quality of works.
Thanks