Only false promises made by casagrand
Jun 06, 2021 01:28 AM
19295 views
(via Mobile)
Product Implementation Rate:
This is my humble request to any new buyer of casagrand to visit its Royce project at Bangalore and ask any resident there. He will only tell you the real picture of his worst sufferings. Casagrand is no doubt best in sales but worst in project quality and implementation. Only false promises are made by them. Even after 9 months of handover, several major jobs are still incomplete.
1 No cauvery water connection done till date despite assurance
- No solar power installation despite assurance.
3 Some work of boundary wall (plaster and painting) , left over portion of outside incomplete drains, main gate structure etc are still left unfinished giving ugly look of society.
- Only 6 months maintenance period after so called handover, whereas several flats are still unoccupied.
5 No fire fighting arrangements there .
- CCTV is symbolic only at few places and not inside blocks anywhere. So, it is of no use.
7.Electrical system is faulty in some areas. Some residents are suffering due to frequent tripping.
Foul smell coming in several flats due to poor plumbing system.
Cracks developed in some flats.
10 Most of the amenities are of substandard quality.
Above pending assured jobs can be done easily, if casagrand takes proper initiative to safeguard its brand value but they are interested to finish only petty nature of jobs and most important job of cauvery water connection will remain incomplete. Therefore, please think hundred times before wasting your hard earned money in casagrand property. Best of luck.
-
-