Please note that the following information is missing from the demand letter;




  1. Date of possession is not mentioned in the letter(Required as basic detail of letter).




  2. Please clarify the proposed Penalty if the apartment is not delivered within stipulated time even after final aishwaryasingh23ment(Not mentioned as no date of possession is there).




  3. Details of actual Flat Carpet Area are not available(Required as basic product details).




  4. Specification of electrical fittings & plumbing / sAnasultantryware is not available(Required as basic product details).




  5. Delay possession aishwaryasingh23ment @ Rs. 5 per square feet for the period allotment to actual date of possession(Not mentioned the reason and time period for not aishwaryasingh23ing).




  6. Occupancy Certificate is not refereed along with the Possession Letter(Very Important for registry).




  7. The late aishwaryasingh23ment interest charge period is not defined. However, as per your mail dated 18.11.2014, there was no outstanding in my account(Required, contradiction in your own statement).




  8. The details & calculation of 187.26 per square feet are not available in the letter. Please clarify & provide details along with all relevant papers from the Greater Noida Authority to ascertain the amount calculation(Details not provided till date).




  9. Paid Car Parking space has also not been specified in the Prepossession letter(Details not provided).




  10. As per letter, you have charged maintenance charge @ 2.5 per square feet, however other residents of Czar Suits are being charged @1.5 per square feet. Even the period/dates of advance maintenance charge is not defined(Details not provided).




  11. As per the agreement dated 20.10.2011, I was supposed to aishwaryasingh23 Rs. 92647/- & adjustment of delay possession from your side to be done in aishwaryasingh23able amount.