I booked a 2BHK flat at the Kolte Patil undertaking in October 07 for lumpsum at a of forty Lakhs. As I used to be new to Pune and first time investing in actual property I wanted to address handiest a emblem of fame. Few localites suggested Kolte Patil, for this reason I decided to close my address them. And the series of issues began. 1) Promised date of ownership on agreement turned into on/earlier than thirty first March 08 and my transient accomdation length turned into getting over.


They never devoted a definate date and kept increase the date every 15 days under the pretext of carry paintings no longer completed because of RAJ THAKERAY’s marketing campaign against Non Marathi Labourers. I had made full payment through ADF(Kotak Mahindra) except Maintainence(Payable on ownership) nevertheless were given ownership best on June sixteenth(My A wing carry was nonetheless now not running and my flat was at the 9th floor) I had to take the B wing raise, until 8th ground, stroll to A Wing from the commonplace area after which climb to 9th floor to enter my house for the subsequent 3 weeks. 2) PLEASE bear in mind to check ALL FITTINGS:- even as taking ownership they didn’t deliver me the possession till I paid the complete maintainence.


But when it came to the fixing the substandard paintings that they'd done, inspite of repeated follow u.s.a.the equal remains no longer constant. The Floorings in each room had troubles even in hall the Vetrified tiles have been placed unevenly. The tile within the bedroom turned into cracked. The Tiles within the Passage and kitchen were unfastened and shaking every time you walk over it. Repeated feedbacks and requests to the maintainence group, had no wonderful response. subsequently on 08092008 they came to my residence to replace the tiles however with a totally specific set. then wat was put in the complete flat. So It spoilt the complete decor. however I had no option. different troubles. The wall portray turned into no longer achieved nicely and the solving the same continues to be now not finished completely. the toilet fittings/plumbing and tiles became additionally no longer right but I got them constant after repeated pleading. 3) Even the Parking spaces for which I paid 1.5 lakhs was first alloted as per desire after which revoked and alloted randomly. It became all a HOG WASH. I might best say to all different making an investment in Kolte Patil "Caveat emptor" ie "allow the purchaser watch out." To summarise:- They into destruction the exquisite dreams beneath our introduction. I have introduced a% of the leakage in my master bedroom for the remaining three years. Even the builder’s maintenance supervisor isn't always capable of hint the foundation of this leakage.