Never pass for any aparna task
Jul 28, 2017 08:32 PM
63717 views
(via Mobile)
Product Implementation Rate:
Never pass for any Aparna task. The completing is sincerely horrific as there are lot of teething troubles. They simply use subcontractors to finish up paintings and as soon as completed, after handover, whilst problems come up, the construction corporation tends to skip the greenback to maintenance whilst upkeep tendsto blame the construction business enterprise. furthermore with each Aparna housing complicated numerous entities will come up as a bundle deal and none of them lives upto expectation -
1) APMS or the preservation arm. You’ll have to do lots of observe up to resolve the grievance.
2) Sritel or the telecom carrier provider.
Their telephone offerings continue to be out of order maximum of the time and installation additionally takes a number of time and observe up. some of the private troubles faced -
1) air cracks on maximum walls, from time to time very extreme and ugly searching 2) frames of bathroom doors popping out
2) cracks in pipes
4) tiles not geared up well and water logging hassle in toilets five) keys no longer to be had for application doors
6) predominant hassle - water seepage and leakage from toilet to the room 7) electric factors and lower back up points arbitrarily assigned Please be very cautious earlier than buying any belongings from Aparna structures. We’ve learnt it the difficult way.
-
-
Thank You! We appreciate your effort.
Upload photo files with .jpg, .png and .gif extensions. Image size per photo cannot exceed 10 MB