Aadi Properties - Mumbai Image

Aadi Properties, Mumbai

Upcoming Projects : 0|Under Construction Projects : 0|Ready to Move Projects : 1|Sold Out Projects : 0
100% 3.5 2 Reviews Claim this business
OTP Verification

Enter 4-digit code

About Us

Location

Behind Parivar Society, Next To Kanjur East Police Station, Anna Godbole Marg, Kanjurmarg East, Mumbai, MH

Project By Aadi Properties, Mumbai

Status
Ready to Move
3.5
100%
Kanjurmarg, Mumbai
₹82.5 L - ₹1.13 Cr
1,2 BHK Apartments
See More

Reviews on Aadi Properties, Mumbai

Summary
Nov 03, 2018 03:00 PM Read (via Android App)

Horrible builder.More than 30O families waiting for possession for the last 7 years.Builder not ready to meet flat owners.Does not pay interest on delayed possession.please be wary before dealing with this builder.Genuine flat buyers are hassled.Has gone to the extent of asking extra money for 4 sqft also. Fraud Builder.Makes false promises. All of its projects are delayed especially ACME Ozone. Strongly believe that buyers should stay away from ACME.Not sure how banks like HDFC is funding/supporting this project
Aug 24, 2018 01:46 PM Read (via Android App)

This project will be completed in 2020 and In 2020 our country will be more developed so it is a good that in 2020 It will be completed.

But in the mumbai already many similar projects are there so I suggest you that next time try in another city not in metro city because we have to develop our full country not only few cities.

In this modern world an builders faces lots of challenges in the construction of a house or buildings to compete the world in the form that how to make a modern house or building which is environment friendly, energy saving and low cost etc, such sort of problems putting pressure on builders now a days.

Because of the rising cost of the material which is used in traditional construction methods which are unlikely to meet the demands for future developments. That's why more and more builders or designer are now understand the benefits of the development of modern material which are gradually used in the buildings now a day's.

Housing associations are now encouraging the housing corporation to use the modern ways of construction known as modern methods of construction when building new developments. This policy is a direct result of the Government's response to a number of drivers that have resulted in what it perceives to be a crisis in housing supply.

In areas of growth, house construction in the private sector has tended to focus on the production of traditional houses - either semi-separate family homes or larger separate executive homes. These private sector dwellings are beyond the reach of most first time buyers, particularly key-workers in comparatively low-paid jobs in the public sector. The Government is looking to housing associations to give dwellings for those who can't afford to buy the house. The Housing Corporation is the key agency regulating

The Housing Corporation is the key agency regulating delivery of housing in the social housing sector. They assist with delivery of policy via grants awarded through the Approved Development Programme ( ADP) . A proportion of the ADP has been ring-fenced ( The Challenge Fund) for the delivery of new homes quickly and cost effectively, in areas of high demand as well as stimulating a step change in supply by encouraging innovative forms of construction.

In the face of the support from political and regulatory authorities to make greater use of modern methods, lots of stakeholders are still unsure about modern methods of construction for some of reasons. In the case of housing associations there is doubt about whether or not modern methods are able to deliver energy efficient homes at good reasonable prices. This pamphlet aims to demonstrate that homes that cross the requirements of building regulations in sense of their material efficiency can be built cost-effectively.

SIPS

Structural insulated composite panels are one of the most satisfying technologies in the construction industry. Started in the years of 1940s when the new sandwich design concept was generated, where there were two wooden materials and a different element between them generating maximum strength to the structure.

Design

As mentioned earlier, the SIP has an insulated structure between two wooden boards. This most commonly used materials are expanded polystyrene ( EPS) , extruded polystyrene ( XPS) or rigid polyurethane foam.

Showing: 1 - 2 Reviews on Aadi Properties - Mumbai

YOUR RATING ON

Aadi Properties - Mumbai
1
2
3
4
5

Similar Builders in {{section.title}}

View All
{{product.builderrating}}
{{product.builderrecomm}}
Ready to Move Projects
{{product.readycount}}
Under Construction Projects
{{product.undercount}}
Upcoming Projects
{{product.upcount}}

Aadi Properties, Mumbai Photos